About a month before the trip I realized that I had lots of hand-knit woolen warm socks but Richard had none. I knit an off-white pair with yarn I had left over from something else. Then I ordered red wool and blue wool. The yarn arrived on Thursday, January 13th and I set to work.
Today, January 21, I started the second red sock. The first red sock needs the ends woven in and blocking. The red socks must be finished by Sunday noon so that I can block them by machine washing and then dry them flat.
I am busy knitting.

No comments:
Post a Comment